Port Canaveral completes West Turning Basin deepening project

Uncategorized







Port Canaveral is currently in the bidding process to buy a mobile harbor crane with an 18/19 container reach.

   Port Canaveral has completed a project that deepened the West Turning Basin to the authorized depth of 43 feet (plus two feet of additional overdredge), complementing the existing authorized port channel depth of 44 feet, the port said in a statement Thursday.
   The six-month project allows deeper draft access to the port’s container cargo facility operated by GT USA at North Cargo Berth 5 and 6.
   Over 826,000 cubic yards of dredged material was removed by San Rafael, Calif.-based dredging contractor, Dutra Group.
   The channel is clear from overhead obstructions, such as barges and wires, and does not have any air draft restrictions.
   “The West Turning Basin deepening was necessary for Port Canaveral to allow larger cargo vessels safe access into our port,” Port Canaveral CEO Captain John Murray said.
   Although 80 percent of Port Canaveral’s revenues are generated from the cruise business, the port is equipped to handle a variety of cargo, including containers, breakbulk, roll-on/roll-off, project and bulk commodities, according to the port’s website.
   Looking ahead, Port Canaveral said it is currently in the bidding process to purchase a mobile harbor crane with an 18/19 container reach. The port anticipates the crane will be fully operational by the end of 2018.


Importing and managing the logistics of your precious freight is no easy task. Compliance to U.S. Customs & Border Patrol is essential to your cargo clearing customs. Use a freight forwarder to lower your chances of having shipment delays and to oversee all of your international freight logistics. Contact a customs broker to file your ISF and issue any pre-alerts to avoid penalties and delays, and arrange your ocean freight and imports customs clearance.